February 8, 2018 – Salt Lake City is hosting an open house to discuss the reconstruction of 900 S and the construction of additional sections of the 9 Line Trail.
The street is in bad shape with rough pavement and potholes in many places. The reconstruction is expected to begin in May 2018 and will run from 950 E to 1300 E.
A new section of the 9-Line bike path will be built on the south side of the roadway. The roadway itself will undergo a road diet and will be converted to 1 lane each way and a center turn lane and bike lane on the north side in addition to the bike path. This configuration is safer than 2 lanes in each direction with no center turn lane. As part of the project, the intersection of 900 S and Gilmer will reconfigured as a new T-Intersection, which should give cyclists safer access to the Col de Gilmer.
The open house will be Thursday, February 8 from 6-8 pm at the Tracy Aviary Chase Mill House in Liberty Park. The public is encouraged to attend.
For more information and to take part in the survey, see: http://www.slcgov.com/transportation/900south
Salt Lake City to Reconstruct 900 S., Add Bike Path – Open House to be Held on 2-8-18
More From Forest Beat
Matthew Boerke Believes We Are All Part of the Solution
Matthew Boerke's daily commute mileage is 11.3 miles one way, 22.6 round trip; which is a fairly significant trip. He rides 2500 South to...
2
minutes
A Guide to Cycling Pedals
By John Higgins - Cycling pedals are taken for granted by experienced cyclists and viewed with trepidation by new cyclists. What is their function and...
13
minutes
Off Season Nutrition: What Does Eating Clean Mean to You?
By Breanne Nalder, MS, RDN, PLAN7 Endurance Coaching Dietitian and Nutrition Coach — Isn’t Fall wonderful? We have the residual summer fitness and gorgeous weather...
3
minutes
A Winter Cycling Program Helps Cyclist's Mental Health
By Amanda Choudhary - "I Ride Louder to feel strong!â€
I signed up for Ride Louder at the JCC right after my third pregnancy loss. I...
2
minutes